Integrated Power Development Scheme (IPDS) of NBPDCL
|
I. Strengthening of Sub- transmission and distribution network in urban areas.
|
II. Metering of Distribution transformer/feeders/Consumers in urban areas.
|
III. IT enablement of distribution sector and strengthening of distributionnetwork, as per CCEA approval.
|
IV. The scheme will covers relating to Strengthening of Sub- transmission and distribution system including provision of solar panels, metering of Distribution transformer/feeders/Consumers in urban areas& IT enablement of distribution sector.
|
Work/ Scheme
IPDS -7 Circles
Additional Sanction for Conversion of bare conductor to AB Cable
Additional Sanction in Muzaffarpur Town ( Earlier DF AReas)
|
Cost(INR)
1058
38.39
179.43
|
Sl.no.
|
Description of Work
|
Unit
|
Survey Quantity
|
Completed Quantity
|
1 | New SUB-SUBSTATION | NO | 36 | 20 |
2 | 33/11 KV ADDITIONAL Xr | NO | 23 | 14 |
3 | CAPACITY ENHANCEMENT of 33/11 KV Xr | NO | 20 | 16 |
4 | R&M OF 33/11KV S/S | NO | 14 | 2 |
5 | 33KV NEW FEEDER | KM | 389.79 | 246.74 |
6 | 33KV FEEDER RECONDUCTORING | KM | 362.29 | 222.43 |
7 | 11KV NEW FEEDER | KM | 837.54 | 490.18 |
8 | 11KV FEEDER RECONDUCTORING | KM | 544.96 | 273.26 |
9 | New LT WITH AERIAL BUNCHED CABLE | KM | 2113 | 1839 |
10 | R&M OF LT LINE (BARE CONDUCTOR TO AERIAL BUNCHED CABLE) | KM | 2446 | 1368 |
11 | INSTALLATION OF NEW DT | NO | 3090 | 2380 |
12 | CAPACITY ENHANCEMENT OF DT | NO | 1432 | 1164 |
13 | R&M OF DSS | NO | 969 | 464 |
14 | FEEDER MEETERS | NO | 605 | 345 |
15 | DT MEETER | NO | 1365 | 665 |
16 | CONSUMER METER | NO | 120522 | 104927 |
17 | SOLAR PANEL | KWp | 961 | 852 |
|
|
|
|